Single-Wide Removal in Garden City

Single-wide mobile home demolition

Add photos (optional - helps with accurate quotes)

0/10 photos added

Delivering fresh starts since 2022

Garden City has lost a lot of its mobile home parks over the years, especially along Chinden, and the ones still standing sit on land that's gotten more valuable every year. Taking down a single-wide here isn't just a haul-away job. It usually means working inside a park with its own rules, sometimes near the floodplain along the Boise River, and almost always under a permit the city actually checks for.

Before any of that, it helps to know what the removal involves and what Garden City expects on paper.

The paperwork comes first

Garden City requires a Manufactured Home Removal/Demo Permit before a single-wide comes down, separate from the standard building demolition permit. Expect it to involve erosion control sign-off and a plumbing cap inspection through DOPL before the unit is disturbed.

A lot of park lots and riverside lots in Garden City also fall under floodplain review, since the city sits right along the Boise River. If the address is anywhere near the Greenbelt or the Waterfront District, that review is worth checking before you set a date. And if a dumpster needs to sit in the street instead of the driveway, that's ACHD right-of-way, not the city — a separate permit applies.

Where the material actually ends up

Most of what comes off a single-wide in Garden City heads to the Ada County Landfill at Hidden Hollow, just a few minutes north off Glenwood or Hill Road to Seamans Gulch Road. For drop-offs instead of a full haul, Boise Transfer Station on Curtis Road is the other option.

How a job gets sorted depends on what the landfill and transfer station will take:

  • Scrap metal — siding, frame, appliances — goes in free at the landfill
  • Clean wood and C&D debris are accepted, but treated or painted wood doesn't count toward diversion
  • Tires and Freon-containing appliances both carry a disposal fee
  • Mattresses and yard waste are accepted without issue
  • Loads have to be covered or secured on the drive over, same as any other site

What actually moves the timeline

Every park lot is a little different, and that's usually what decides how a single-wide job runs in Garden City. A unit set deep in an older park with a narrow access lane takes longer to stage than one on a street-facing lot. Skirting, tie-downs, and any attached decking or carport add steps before the home itself comes apart.

Utility disconnects matter too — the plumbing cap through DOPL has to happen before demolition, not after, so that step can hold up the schedule if it's not arranged ahead of time. And the mix of material leaving the lot changes where it goes: a unit with mostly clean wood and metal clears out faster than one with a lot of treated material or appliances that need a Freon fee at the gate.

A single-wide in Garden City comes down fastest when the permit's in hand and the lot's been walked ahead of time. Mobile Home Demolition Boise handles that groundwork as part of the job. Call for a free estimate and we'll look at the lot, the permit, and what it'll take before anything starts.

Call for Garden City Service

(208) 247-3193
Website byReview Monster - website design and digital marketing